PreviewA design preview by Data Nexus, not the airport's website. Flight times are sample data — check with your airline. Official site

Advertising

A million people through one building

RKT is a single-terminal airport, which is unusually good news for an advertiser. There is one route through the building, everybody walks it, and in 2025 a little over a million people did.

1m+Passengers in 2025, up 51 per cent year on yearexactly 1,000,303
16Scheduled international destinations
1.35MOvernight guests in the emirate in 2025

Audience

Who walks past

The airport's published traffic. There is no per-site impression count and no independently audited footfall study — where you see a number here, it is passenger traffic, not an estimate of eyeballs on a panel.

One terminal, one route

Departures, arrivals, security, gate and baggage reclaim all sit in a single building. Coverage does not depend on which pier a passenger is routed through, because there is no pier choice.

A mixed audience

Scheduled traffic to India, Pakistan, Saudi Arabia, Russia and Egypt sits alongside resort-bound leisure arrivals and a business aviation operation. The mix shifts by time of day rather than by terminal.

Dwell in the right places

Baggage reclaim, passport control and the departures hall are where the time is spent. Those are also where the digital and large-format inventory sits.

Inventory

Inside the terminal

  • Light boxes
  • Tri-vision boxes
  • Digital screens
  • Banners
  • Door and window decorative advertising
  • Wall wraps
  • LCD video in the baggage claim area
  • Leaflet displays
  • Trolley branding
  • Branding behind the boarding passes
  • Designated areas for promotional stands

Outside the terminal

  • Large-format banners
  • Flags on lamp posts
  • Car park branding
  • Security railing branding
  • Outdoor tri-vision billboards
  • Mesh one-way-vision branding on the sliding glass doors of the arrivals and departures terminals
Promotional stands and sampling activity are placed by agreement — the site, the dates and the staffing are all agreed in advance, and anyone working beyond the public areas needs an airport pass.

Planning ahead

The terminal is changing

A new terminal of around 30,000 m² is under construction, planned for three million passengers a year and targeted for completion in 2028. If you are negotiating a multi-year contract, ask how your sites are treated through the transition — it is a fair question and we would rather answer it at the start.

About 30,000 m²3 million passengersTargeted 2028

Enquiries

How to book

Advertising is handled by the airport's commercial team. Tell us the campaign, the window and the formats you are interested in, and availability comes back with rates.

Issued on request, not published

  • Panel dimensions, production specifications and material requirements
  • Rate card, minimum lease terms and production lead times
  • Site-level impression and dwell data where it exists
  • Installation windows and access arrangements

Commercial office

Route development, advertising, retail, office space and land enquiries are handled by the same team.

Telephone
+971 7 207 5200 · ext 205

What to send with a first enquiry

  • Company name, a named contact and an official mailing address
  • Company credentials — trade licence, ownership and relevant track record
  • A short business plan for what you intend to operate here
  • What you need, in square metres or by format, and for how long
  • Anything else that would help us answer quickly

Enquiries go to the airport's commercial team. Nothing is reserved, allocated or priced until we have replied in writing.

Formats listed are the airport's own published inventory. Availability changes; nothing is held until it is confirmed in writing.